|
Search Products |
|
|
|
|
Wastewater grinder |
|
|
|
Solid waste recycling system |
|
|
|
Huanchuang (Xiamen) Technology Co.,Ltd Phone: :+86 592 5029670 Fax: +86 592 5029673 Email:info@hcwater.com Add; 22 Guanri Road, Software Park 2, Xiamen, China
|
|
|
|
News |
|
|
Garbage incineration emissions of new standard will fall to the ground |
Edited:HuanChuang technology Date:2014-4-21 11:29:58 |
|
|
|
Before and after the two to solicit public opinion, which lasted six years, waste incineration pollution control standards revision is beginning to take shape. In the April 9th meeting of the environmental protection department of the executive meeting, considered and approved in principle the "pollution control standard for hazardous wastes incineration" and other 4 environmental protection standards, and decided, "pollution control standard" after further revision of MSW incineration, together with the State Quality Inspection Administration jointly issued the implementation. Expert analysis thinks, the revised standards and pollutant limits further strictly, set a new benchmark for planning and design, project construction and operation management of MSW incineration, brings opportunities for waste generators that have actual strength and equipment manufacturers.
garbage incineration emissions standards and the EU is close to
Garbage incineration standard for pollution control on the revised "" (hereinafter referred to as the "standard") in applicable scope, into life sludge generated by sewage treatment facilities and special incinerator general industrial solid waste pollution control, increase the garbage incineration furnace start-up, shutdown control, fault or accident emission requirements, strict the municipal solid waste incineration plant, sulfur dioxide emission standards for particulate matter, nitrogen oxides, hydrogen chloride, heavy metals and their compounds, dioxin and other pollutants.
The revised standard, not only the waste incineration standard can be perfect, can also reduce people's concerns about waste incineration. More importantly, the standard, the garbage power industry made more stringent requirements. According to industry sources, at present, must be equipped with waste incineration power generation, power plays an important part of revenue. Therefore, for the scale, low pollution emission standard garbage power generation business is good.
It is reported, the standard is the European Union standards revision. The European Union standard requirements of fault or accident duration should not exceed 4 hours, 1 years shall not exceed a maximum of 60 hours. New standards and EU standards approach, current monitoring standard after hydrogen chloride, sulfur dioxide and nitrogen oxide is hours mean, the revised standards including hours mean and daily mean data, than existing standards more stringent. In addition, according to industry reports, the dioxin standards concern for people, than the current standards have greatly improved.
The new standard on the impact on industrial waste incineration, general manager of Shanghai Environmental Sanitation Engineering Design Institute, Shanghai City Environmental Engineering Design Science Research Institute Co., Ltd. Zhang Yi said: "one is the overall impact will not be great, because it has largely been ahead of time to digest, but in recent years the new garbage incineration project have performed similar high standards; two is the influence is unbalanced, impact on the large-scale incineration plant incineration plant less than small, impact on the new incineration plant incineration plant is less than the original. Notable is, environmental protection industry more concerned about the living garbage incineration project, final and no provisions in the new standards."
standards and supervision into the garbage power generation industry grasps
Improve waste incineration emissions standards, strict supervision, promote the service costs to upgrade. Although the domestic part of the city of new incinerators have standards for the implementation of the EU, but compared with the international standard, there is still a considerable gap.
Future, the raising of standards, strict supervision will be the main way of national scale waste incineration, it will promote the transformation and upgrading of processing facilities of garbage, garbage power generation enterprises operating costs increase.
Especially the standards, improve the emission standards, means that the access threshold, the lack of supervision, emissions are not compliance enterprise will undoubtedly be kicked out, the industry is toward the development of benign orbit.
"In recent years, waste incineration project to start. At present, our country city life garbage incineration in a large scale in the investment and construction period, the industry entered the market overall development stage. The industry, state-owned enterprises, listing Corporation, foreign enterprises, private capital and other multi investment main body actively join the market competition, the formation of a mature clear business model." Liu Weirong China Wuzhou Engineering Design Institute of environment and energy engineering design and Research Institute said.
Garbage power generation is thriving, but the industry concentration is still high, according to statistics, currently the number of waste incineration field investment operation nearly 100 enterprises, a total share of the top six enterprises in the market rate of nearly 52%, which account for more than half of the market share. The small and medium-sized enterprise survival space is limited, therefore, enterprises still need to improve their competitiveness, constantly upgrading, achieve a high standard, low emissions. Otherwise, mergers and acquisitions, integration, can hardly be avoided even shuffle.
In addition, the garbage power generation industry steal row up, low price phenomenon still exists. Expert proposal, should establish a long-term supervision system. If the lack of supervision, steal row about easy. For example, flue gas treatment agent does not add lead exceed the standard, acidic gas inputs not activated carbon in fly ash, collected by dioxin exceed the standard not hazardous waste treatment without the addition of chelating agent, leachate steal row, the furnace temperature not up to but not combustion causes all smoke index even treatment could not meet the standard. |
|
>> Back |
|
|